| 24 | == Meeting notes == |
| 25 | * Requirements |
| 26 | * Separate out best practices, maybe cross reference |
| 27 | * Dieter: there should be no restrictions on publication |
| 28 | * Menzo: should not be a problem for this spec |
| 29 | * Work thus far |
| 30 | * Thorsten is working on the ISO draft which will be published |
| 31 | * must be in line with CMDI 1.2 |
| 32 | * 1 year left to complete |
| 33 | * Information currently in spec is adapted from the ISO draft |
| 34 | * the specification document should look different from ISO document to prevent confusion |
| 35 | * parallel development of these two |
| 36 | * Currently missing |
| 37 | * references |
| 38 | * definitions for header should comply with CMDI 1.2 |
| 39 | * change component specification language |
| 40 | * everyone agrees with the following action points: |
| 41 | * full adaptation to CMDI 1.2 feature set and changes w.r.t. CMDI 1.1 |
| 42 | * further formalisation (e.g. usage of the key words (must, required, should etc) as in the FCS[2] specification), 'sharpening' of definitions etc. |
| 43 | * inclusion of the specification language UML diagram |
| 44 | * addition of illustrative and exhaustive XML examples |
| 45 | * splitting off or at least separating 'best practices' and other bits of text that are less formal and more usage oriented |
| 46 | * Planning & distribution |
| 47 | * Work on CMDI 1.2 schemas can happen concurrently |
| 48 | * Work distribution and planning |
| 49 | * Menzo: I will start working on the toolkit (start in August) |
| 50 | * Oliver: I want to work on the schema (back in september) |
| 51 | * Thorsten: I will revise document (not before september) |
| 52 | * Twan: structure of the document (start in August) |
| 53 | * Axel: back in september |
| 54 | * Next meetings: |
| 55 | * Virtual meeting early September reporting on work done in August by Menzo and Twan |
| 56 | * Face to face during CLARIN conference 23-25 October, preconference |